Semi-Computerized Scap Tyre Recycling Line to Rubber Powder
hydraulic system comma straightforward operation and safe period of time
Mechanical description colon the tires more than 800 require to lower comma and minimize into four items in EPT periodthe dimension of piece is two hundred-500mm period of time
Notes for making use of tire cutter colon
a interval Inspect the knives often comma if appear evident blunt comma it need to be sustain timely comma and the support is two-three several years interval
b period of time the oil in hydraulic station must be filtered and altered frequently period EPTly filter once every single a single and fifty percent calendar year period
c period of time Donning elements colon rubber seals comma delivered with an additional set when ship the EPT to the customer interval
3 amp4 period EPT tire shredEPTZPS-900
Use colon
This EPT can immediately crush tires smaller sized than 800mm tires period of time At the EPT temperature comma can be set directly crushed into 50 ast 50 mm block comma so the following rotating can grind into ten-30 meshes or wire and fiber separation gear time period
Feature colon
This EPT is a compact construction comma sophisticated technologies comma minimal vitality consumption comma high performance comma smashing off the check place for the construction comma upkeep is particularly convenient semi tools with carbide surfacing technological innovation comma substantial hardness comma large wear resistance comma and repeated restore making use of comma so has a EPTer services daily life semi rotary screen for the lattice framework of metal mesh comma blanking huge spot comma enabling the screening of experienced rubber interval Following the partition of massive tires can accomplish the influence of the exact same excl
Mechanical description colon the tires of 800mm diameter and rubber ring can right be damaged into 50 ast50 mm of rubber block time period
Notes for employing EPT tire shredder colon
a time period Inject gear oil into EPT oil lparhypoid equipment oil rpar comma principal bearings use calcium-based grease lubrication comma three months after the operation of the EPT comma the oil need to be changed and thoroughly clean the fuel tank time period Considering that then alter the oil when time each and every calendar year period
b After deal with three comma000 tons of squander rubber lparin standard situations rpar commathe purchaser need to grind the blade chopping edge after time period The blades is the wear parts comma the EPT service daily life is 5-6 years comma when offering the EPT to the customer comma the shredEPTwill be equipped with edge hardness layer patching materials lparelectrodes rpar interval
five interval Double Rolls Rubber Crusher XKP-560
Use colon
Mainly used for crack huge rubber blocks into forty-50mm modest rubber blocks period
Specialized parameters colon
Structure colon The rollers adopt alloy chilly tough cast irons with use-resisting comma sturdy people period The mill flour is with teeth comma higher groove interval
In orEPTto lengthen the support life of the cracker comma we suggest develop foundations for rubber cracker period of time
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and tough equipment floor EPT with reduced sound and EPTer provider existence period
5Our crackers are developed XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with good functioning platforms comma all the wires will be connected effectively from controlling method to motor time period When utilizing the EPT comma the buyers just want to connect straight to the EPT period of time
Complete-Automatic Squander Tyre Recycling Line to Rubber Powder
No interval | Identify | Design | Qty period lparQty rpar |
Motor EPT lparKW rpar | ||
1 | One hook debeader | LSJ-1200 | one | 11 | ||
two | EPT tyre cutter | QDJ-1200 | one | five period5 | ||
three amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | 1 | sixty one period5 | ||
5 | Double Rolls Rubber Crusher | XKP560 | one | ninety | ||
six | Massive conveyor gear | BCL-eight | one | 2 | ||
seven | Little conveyor gear | BCL-3 | one | one period1 | ||
8 | Massive Magnet separator | BMS22 | one | 2 period2 | ||
nine | Small Magnet separator | SMS-1 | 1 | 1 period1 | ||
ten | Massive Shaking monitor | BSS-eight | 1 | 7 period5 | ||
eleven | Small Shaking display screen | SSS-three | one | 3 | ||
twelve | Fiber separator | FS110 | 1 | five period5 | ||
thirteen | Good Rubber Powder Pulverizing EPT | XJFS-420 | four | 123 | ||
Square vibrating sieve | 600 | one | ||||
Rubber powder collector | JFS500 | 1 | seven period5 plus0 period75 equals8 period25 | |||
Screw conveyer | Phi200mm | one | period75 | |||
Screw conveyer | Phi132mm | 1 | period75 | |||
Storage pin | 1 period5cbm | one | ||||
Hopper | 1 | |||||
Belt conveyer | 1 | period75 | ||||
14 | Metal Baller EPT | 30T | 1 | seven period5 | ||
15 | Rubber powder EPT EPT | one | 3 | |||
24 | 334 period4KW |
No | Identify | model | quantity | EPT | ||
EPT tire pre-processing comma you will get lt 50 ast50MM rubber crumb
Semi-Automatic Squander Tyre Recycling Line to Rubber Powder |
||||||
one | Ring cutter | QQJ-1200 | 1 | 5 period5KW | ||
two | Loop EPT | YQJ-295 | 1 | 15KW | ||
three | Strip cutter | QTJ-370 | one | 5 period5 KW | ||
four | Block cutter | QKJ-two hundred | 1 | eleven KW | ||
Rubber powder processing colon you will get 20-30 mesh rubber powder commaat the very same time comma independent the fiber and metal wire | ||||||
5 | Tyre crusher | XKP400 | one | 45 KW | ||
XKP450 | 55 KW | |||||
XKP560 | 75 KW | |||||
six | Big conveyor tools | BCL-eight | 1 | two KW | period of time | |
7 | Small conveyor tools | BCL-three | one | one period1 KW | ||
8 | Massive Magnet separator | BMS22 | 1 | 2 period2 KW | ||
9 | Small Magnet separator | SMS-1 | one | one period1 KW | ||
ten | Huge Shaking display screen | BSS-eight | 1 | seven period5 KW | ||
11 | Little Shaking display screen | SSS-three | period | 1 | 3 KW | |
12 | Fiber Separator | FS110 | 1 | eleven KW |